Revised Code of Washington (RCW) (Last Updated: August 9, 2016) |
Title 78. MINES, MINERALS, AND PETROLEUM |
Chapter 78.52. Oil and gas conservation. |
Section 78.52.290. Limitation of production to "gas allowable"—Proration.
Latest version.
- Whenever the total amount of gas which all of the pools in this state can currently produce in accordance with good operating practice exceeds the amount reasonably required to meet the reasonable market demand, the department shall limit the gas which may be currently produced to an amount, designated as the "gas allowable," which will not exceed the reasonable market demand for gas. The department shall then prorate the "gas allowable" among the pools on a reasonable basis, avoiding undue discrimination among the pools, and so that waste will be prevented, giving due consideration to location of pipe lines, cost of interconnecting such pipe lines, and other pertinent factors, and insofar as applicable, the provisions of RCW 78.52.270 shall be followed in determining the "gas allowable" and in prorating such "gas allowable" among the pools therein: PROVIDED, HOWEVER, That in determining the reasonable market demand for gas as between pools, the department shall give due regard to the fact that gas produced from oil pools is to be regulated in a manner which will protect the reasonable use of gas energy for oil production and promote the most or maximum efficient recovery of oil from such pools.